V-Twin Forum banner
1 - 1 of 1 Posts

·
Registered
Joined
·
650 Posts
I piggybacked mine on top of the ECM under the right side cover. Loosen the 2 bolts holding the ECM and run 2 cable ties beneath it leaving equal lengths top and bottom. You will see 2 slots molded on the top of the PC where cable ties can be run. Line everything up, then tighten the ECM. Place the PC over the ECM then thread the cable ties through the slots on the PC and finally tighten the cable ties.

Make the cable connections and then tuck them through the frame beneath the battery box. I first wrapped the connections with a couple of turns of electrical tape to keep water out, then wrapped the connector with a piece of foam and then covered that with a ziploc bag. Used a long-ass cable tie to secure that to the frame.
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top